| hasCreationDate | 2011.05.08 |
| hasCreator | mvsen |
| hasDefinition | A ‘template input list’ recording the input required to state if some or all of the mud/circulation fluid comes back to the surface after beeing pumped down the drill pipe on a drilling rig during a cementing job. If all mud circulation fluid comes back, the value is "Yes/Y". If not, the value is "No/Blank". |
| hasDesignation | CEMENTING FULL RETURN INDICATOR - Y/N |
| hasIdPCA | RDS1747951221 |
| hasNote | Role 1: The identifier for the actual 'wellbore cementing job'.|Role 1:A code stating if a full return took place, Y or N|Note 1. If the code is "Y" the actual 'wellbore cementing job' shall be classified as a 'wellbore full return cementing job'|Note 2. If the code is "N" the actual 'wellbore cementing job' shall be classified as a 'wellbore partial return cementing job' |
| hasRegistrar | mvsen |
| hasRegistrarAuth | RDS |
| hasStatus | Recorded |