← Search

CEMENTING FULL RETURN INDICATOR - Y/N

ClassOfMultidimensionalObject

http://data.posccaesar.org/rdl/RDS1747951221

hasCreationDate2011.05.08
hasCreatormvsen
hasDefinitionA ‘template input list’ recording the input required to state if some or all of the mud/circulation fluid comes back to the surface after beeing pumped down the drill pipe on a drilling rig during a cementing job. If all mud circulation fluid comes back, the value is "Yes/Y". If not, the value is "No/Blank".
hasDesignationCEMENTING FULL RETURN INDICATOR - Y/N
hasIdPCARDS1747951221
hasNoteRole 1: The identifier for the actual 'wellbore cementing job'.|Role 1:A code stating if a full return took place, Y or N|Note 1. If the code is "Y" the actual 'wellbore cementing job' shall be classified as a 'wellbore full return cementing job'|Note 2. If the code is "N" the actual 'wellbore cementing job' shall be classified as a 'wellbore partial return cementing job'
hasRegistrarmvsen
hasRegistrarAuthRDS
hasStatusRecorded

Referenced by (1)

ResourceVia
RDS17598129528hasRepresented