| hasCreationDate | 2006.06.06 |
| hasCreator | u20278 |
| hasDefinition | Activities related to making up/testing/running/landing/pulling of the completion string /tailpipe and/or production tubing, including setting and testing of production packer(s) run in conjunction with the string in connection with workover. |
| hasDesignation | WELL WORKOVER COMPLETION STRING HANDLING |
| hasDesignationAbbrev | 1772655200 |
| hasIdPCA | RDS17726552 |
| hasNote | As defined by the Norwegian Oil Directorate in the "user guide for the Common Daily drilling Report System (CDRS) Report number OD-95-30" |
| hasStatus | Recorded |