DRILLING RIG ANCHORING

ClassOfActivity

http://data.posccaesar.org/rdl/RDS17730452

hasCreationDate2006.06.06
hasCreatoru20278
hasDefinitionAn activity implying to run and retrieve anchors, adjusting initial anchor tensions and testing anchors.
hasDesignationDRILLING RIG ANCHORING
hasIdPCARDS17730452
hasNoteThe activity is starting upon abandoning the well, all time after BOP and subsea equipment are retrieved is included until last anchor is bolstered and rig is ready to leave location. As defined by the Norwegian Oil Directorate in the "user guide for the Common Daily drilling Report System (CDRS) Report number OD-95-30"
hasStatusRecorded