| hasCreationDate | 2006.05.29 |
| hasCreator | u20278 |
| hasDefinition | A well spud date that is the date when well drilling equipment begin to bore into the earth s surface for the purpose of predrilling a well. |
| hasDesignation | WELL PREDRILLING SPUD DATE |
| hasIdPCA | RDS17818434 |
| hasNote | Predrilling is the activity of drilling a development wellbore to a limited depth for setting the conductor. The wellbore is suspended and the drilling will be completed later (of the same or another drilling facility) |
| hasStatus | Recorded |