http://data.posccaesar.org/rdl/RDS999234043
| hasCreationDate | 2006.10.01 |
|---|---|
| hasCreator | MIG261 |
| hasDefinition | A time difference that is the difference between the actual time spent and the time planned spent drilling to a given depth. |
| hasIdPCA | RDS999234043 |
| Resource | Via |
|---|---|
| RDS999234042 | hasClassified |